Installation is the point where a service contract meets a real house, and the paperwork often assumes that someone has already done the preparation. This guide covers only the preparation step: what has to be ready before the installer or service technician arrives, and which party the contract usually expects to ready it. It does not describe the installation itself, the hand-off after it, or the claim route, which other pages on this site address.

This guide has not read the installation rules of every state and does not state any state's rule. Where a state's rule matters to your situation, check the state page on this site, which names the regulator and the statute and prints the as-of date for any roster. The general points below apply to most service contracts, but the contract in your hands controls.

What Usually Has to Be Ready

Most installers and technicians need the same basic conditions met before they start: clear access to the location, a power source or connection of the type the item requires, enough clearance around the item to set, place, or service it, and a route for moving the item in and out. Some items also need a water line, a vent, a gas or fuel supply, a mounting surface that can carry the load, or a level floor. The manufacturer's installation manual usually lists these requirements. Ask for that manual before the appointment, not during it.

Who Owes the Preparation

Read the contract for a clause that assigns site preparation. Some contracts place it on the owner. Some say the seller or installer will inspect the site and tell the owner what is missing. Some say nothing, which leaves the question to a separate installation agreement, a work order, or the installer's usual practice. If the contract is silent, get the answer in writing before the appointment. A technician who arrives to find the site unprepared may reschedule the visit or decline to proceed, and the contract may not say which of these is allowed or who pays for the lost trip.

Questions to Put to the Seller Before the Appointment

Ask these questions and keep the written answers with your copy of the contract.

  • Which installation manual or specification sheet controls the work, and who will give it to you?
  • Which party is responsible for each site condition, such as power, access, clearance, water, or venting?
  • Does the seller or installer inspect the site before the appointment, or only on arrival, and what happens if the inspection finds a gap?
  • If the work cannot proceed because of the site, does the contract treat that visit as a used service call, and does the owner need to schedule another?
  • Is a permit or local inspection required for this item, and does the contract say who obtains it?
  • Who signs the site readiness record, and does a copy go to you?

Permits and Inspections

Some items cannot be placed or connected until a local inspection is passed. Whether a permit is needed depends on the item, the work, and the place where the item sits. The answer comes from local rules, not from the contract, although the contract may say who handles the permit. Ask the seller whether the contract assumes a permit has been obtained, and ask the installer who will obtain it and when. Keep any paperwork showing that a permit was obtained or an inspection was passed with your contract copy.

Compare Before You Commit

When you compare offers, place the site preparation terms side by side. Contracts can name the same item and still differ on who readies the site, what the installer will check, and what happens when the site is not ready. Write each seller's answers in the same columns. Where one contract is silent on a point that another spells out, that silence is the question to press before you sign.

Where to Check the Published Figures

This guide prints no published figures and names no company for comparison. The state pages on this site print the roster where a state publishes one, on that state's own as-of date, along with the statute or program that governs. The Florida page follows the same layout as every other state page. Check the as-of date before relying on any roster listing, and confirm the rule with the regulator named on the page.